Get quotes
Reference note · The inspection

What happens during an EICR?

Short answer

During an EICR the electrician first carries out a visual inspection of the consumer unit, wiring and accessories, then tests each circuit – continuity, insulation resistance, polarity, earth fault loop impedance and RCD operation. Power is switched off in turns, so expect short outages. They then write up the report with any coded observations and the next inspection date.

1. Agreeing the extent

Before starting, the inspector agrees what will be inspected and any limitations – for example circuits that can’t be switched off, or rooms that can’t be accessed. On larger installations, testing a representative sample of accessories is normal and is recorded on the report.

2. Visual inspection

Checking the consumer unit, cable condition, accessories, signs of overheating or damage, earthing and bonding connections, labelling and anything unsuitable for its location, such as non-IP-rated fittings in bathrooms.

3. Dead testing (power off)

  • Continuity of protective conductors and ring final circuits.
  • Insulation resistance between conductors and to earth.
  • Polarity – that switches and fuses are in the line conductor.

4. Live testing (power on)

  • Earth fault loop impedance, to confirm protective devices will disconnect in time.
  • Prospective fault current at the origin.
  • RCD trip times and test-button operation.

5. The report

Results are recorded in the schedules of test results. Observations are coded C1, C2, C3 or FI, and the inspector gives an overall assessment and the next inspection date. Most electricians send the report within a few days.

Frequently asked questions

Do I need to be at home for an EICR?

Someone needs to give access and should be told about outages. You don’t have to stay for the whole visit.

Will the electrician need to go in the loft?

Often, yes, to check visible wiring and junction boxes. Clear safe access helps.

Does an EICR test every socket?

Not always. A sample may be agreed on larger installations, and it must be recorded on the report.

Related guides

Sources

This guide is general information, not legal advice. Rules differ between England, Wales, Scotland and Northern Ireland.

Quote request · Title blockFree · No obligation
Multi-site? Mention it and we’ll take each site’s details. Quotes from [NUMBER] approved contractors in your area. Privacy.